INTRODUCTION
The Ministry of Energy and Mineral Development is mandated to Establish, promote the development, Strategically Manage and Safeguard the rational and Sustainable Exploitation and Utilization of Energy and Mineral Resources for social and economic development. In pursuit of this, Energy and Mineral Development Sector has made significant progress towards the achievement of the National Development Objectives as spelt out in the National Development Plan II and in the NRM Manifesto 2016 – 2021.
Commercialization of oil and gas resources is underway following conclusion of various studies and agreements and before the Final Investment Decision is taken to allow for construction of oil production and transportation infrastructure commence. The lead refinery investor was identified and the Front-End Engineering Designs are ongoing in Milan, Italy.
Over the last five years, Electricity generation capacity increased from 924.9 MW at the beginning of 2016 to 1254.2MW presently and additional 712MW from new power generation projects are under construction. Expansion of Power Transmission and Distribution Infrastructure is progressing well. The potential of generating power from solar, wind and geothermal energy resources is being promoted to diversify the energy mix and increase the proportion of renewable energy.
Mineral investment promotion program has attained steady progress with an increase in various ore reserves and the airborne survey in Karamoja region.
SUSTAINABLE PETROLEUM DEVELOPMENT PROGRAM
EXPLORATION AND INVESTMENT PROMOTION

Geological, Geochemical and geophysical surveys: Government acquired 60 line-km of geophysical data and undertaken 300 sq. km geological and geochemical mapping of Moroto-Kadam basin bringing to a cumulative coverage of 3700Sqkms of geological and geochemical data and 680 line-kms of geophysical data amounting to 65% basin coverage.An Oil seepage was mapped and confirmed existence of a working petroleum system and a possibility of exploitable hydrocarbons.

DEVELOPMENT OF THE REFINERY

Over the last five years Electricity generation capacity increased from 810MW to 1260.7MW. This was mainly from 183MW Isimba HPP, Agago Achwa II 42MW, Siti II16.5MW, Kyambura 7.6MW and Nagutu 5.9MW.
Eleven (11) additional power generation projects are under construction with a total installed capacity of 712.4MW. These are: Karuma HPP (600MW), Nyamasagani I HPP (15MW), Nyamasagani 2 HPP (6MW) and Kikagati HPP (14MW), Achwa I (41MW), Muyembe 6.9MW, Nyagak III (5.5MW), Muzizi (44MW), Bukinda (6.5MW), Kakaka (4.6MW) and Busitema University solar (4MW).
Once completed, total installed power generation capacity in the country will be nearly 2,000MW.

CURRENT STATUS OF TRANSMISSION AND DISTRIBUTION NETWORK;
The transmission network expanded by 13% to cover 2,989Kms as at end of 2020. The increment is from the commissioning of the following transmission lines.

Increasing Access to Electricity

Electrification of 570 out of 620 Sub-counties to accelerate access is on progress
c) PROMOTION OF RENEWABLE ENERGY SYSTEMS (SOLAR, WIND AND PICO HYDRO RESOURCES)
Over the last five years, Ministry has continued to promote the use of renewable energy technologies in the country with a view to broadening the power generation mix. This is mainly through the following projects;
Biofuel Development and Promotion: Biofuel Act 2020 was gazetted in the Uganda Gazette of August 2020 and draft Biofuels Industry Regulations have been developed. The objective of the regulation is to set out the requirement for licensing the biofuel producers, and oil companies to enable blending of biofuels with petroleum products.
NAMA Biogas Project: The Ministry is implementing NAMA biogas project with the aim of generating electricity from municipal solid and liquid waste in the cities of; Mbale, Jinja, Masaka, Mbarara and Kampala City Council Authority.
Solar fruit driers were constructed and installed in Kikyusa, Luweero District to facilitate fruit drying and crop value addition. In Kasese District, construction of a Solar dryer at Nyakatonzi commenced. This dryer will be used to serve as a demo to the surrounding areas.
A total of 60 solar street lights were installed in Nagongera Town Council, Lumino Town Council, Buikwe Town Council, Rwentuha Town Council, and Mukono Municipal Council.

Solar lighting and solar mosquito killers in schools and health units were installed in; Gangmig Primary school, Barotukei Primary school, Awach Secondary School, Gotapwou Primary School, Golotwolo Primary school,Bukewa Health center III, Lwanjusi Health Center III, and Bugobero Health center.
NUCLEAR ENERGY DEVELOPMENT:
PROMOTION OF ENERGY EFFICIENCY AND CONSERVATION
Government continued to promote the efficient utilization of energy through promotion programs which aim at ensuring sustainable utilization of energy in all sectors of the economy;
.
MINERAL DEVELOPMENT PROGRAM
Tremendous progress in mineral exploration, development and value addition has been made as indicated below;
International conference on great lakes region (ICGRL) mineral certification mechanism; To regulate illegal exploitation of natural resources, Government has commenced on the drafting of Regulations that will enable implementation of ICGLR Regional Certification Mechanism.

Establishment of the Geological and Mineral Potential of the Country; 103 million tonnes (MT) of iron ore in Kabale District and 15MT in Rubanda District have been established, bringing the total iron ore reserves in south western Uganda to 318 MT with estimated resource of up to 1billion tonnes. The iron ore in Kabale and Muko is associated with gold, Nickel, Zinc, Tin, Titanium and wolfram. Feasibility study for establishment of an integrated iron and steel plant in Uganda has been done.
Mineral laboratories; Government Established a functional mineral analysis laboratory at Entebbe, and New equipment (ICP-OES & Iron Chromatography) is being added.
Kilembe Mines Project; Government put in place an inter-ministerial committee to identify a private investor for the development of the mine. The process of identifying the investor under a Public-Private Partnership has commenced. Draft Expression of Interest and Request for Proposal has been prepared.
PRIORITIES FOR THE NEXT FIVE YEARS, (2021-2026)
In order to contribute effectively to the national economic recovery, the sector has identified within its policy goals the key areas of focus as follows: –

Mineral development sub-sector: Complete the airborne geophysical survey of the Karamoja Region, put in place a modern mineral laboratory as well as mineral beatification centers in the country, and add value to the mineral reserves being discovered